Engie secures financing for 327.7 MW wind project in Brazil

Subscribe to our newsletter and get the latest news and business opportunities in your inbox

The Administrative Council of Engie Brasil Energia SA has approved borrowing BRL1.04 billion (US$ 329.4 million) from Brazil's National Development Bank (BNDES), to support the development of the 327.7 MW Campo Largo Phase 1 wind project. No further details about the deal have been disclosed.

Lorem ipsum dolor sit amet, consectetur adipisicing elit. Commodi delectus, dolorem doloremque ducimus eius error in magni maiores nam natus nobis nulla praesentium quae quis, reprehenderit rerum sint sunt unde.

Lorem ipsum dolor sit amet, consectetur adipisicing elit. Beatae cupiditate dolore doloremque dolorum, ducimus ea et fugiat impedit iure labore magnam, nisi quis repudiandae suscipit tempore vel voluptate? Beatae, voluptate! Lorem ipsum dolor sit amet, consectetur adipisicing elit. Adipisci deleniti, eos id inventore iusto molestias neque possimus! Accusamus aliquid animi commodi cumque nam nemo! Doloribus est molestiae numquam repudiandae totam.

Lorem ipsum dolor sit amet, consectetur adipisicing elit. Accusamus eligendi id impedit incidunt labore maxime rem repudiandae saepe. Accusamus fuga nesciunt quos. Ab architecto culpa, eum mollitia optio quaerat veniam!

Join IPP Journal and get full access to our database

or log in by clicking here

List of country news

Country news

  • January 29, 2018

    President of Brazil submits bill for US$3.8 billion privatisation of Eletrobras to Congress

    The President of Brazil, Michel Terner, has advanced the privatisation of state-owned power company Centrais Elétricas Brasileiras SA, commonly known as Eletrobras, by submitting a bill defining the terms of the sale to Congress. The bill states that the company will be privatised through a capital increase, with an option for a secondary offering of government shares (currently 52%).

    Read more
  • December 26, 2017

    CPPIB and Votorantim JV Invest in Brazilian Power

    Canada Pension Plan Investment Board (CPPIB), a professional investment management organization, and Votorantim Energia, the energy subsidiary of Brazil’s Votorantim Group, announced that they have signed agreements to form a new joint venture focusing on investments and developments in the Brazilian power generation sector.

    Read more
  • December 21, 2017

    Enel wins 618 MW of wind capacity in 3.8 GW tender in Brazil

    The Power Trading Chamber (CCEE) of Brazil has announced that more than 3,841.6 MW of power supply contracts were awarded in the tender that took place yesterday. Around 572,518,389 MWh were awarded for a total BRL108.46 billion (US$32.96 billion), or an average price of BRL189.45 (US$57.5) per MWh.

    Read more
  • December 19, 2017

    US$2.66 billion transmission projects auctioned in Brazil

    Brazil's Ministry of Mines and Energy has announced that the winning projects in the power transmission line auction that took place on Friday 15 December represent BRL8.75 billion (US$2.66 billion) in investments.

    Read more
  • December 15, 2017

    Largest transmission line goes into operation two months in advance

    The first Latin America ±800 kV UHVDC (Ultrahigh-Voltage Direct Current) Electricity Transmission Line came into operation on December, 12th 2017 which drains energy generated by the Belo Monte Power Plant in Xingu (Pará, North of Brazil) to the National Interconnected System (SIN – Sistema Inter Nacional) in the Southeast region. 

    Read more

Share this news

)

Join us

In order to get full access to News section, you must have a full subscription. You can check all the benefits of becoming a member and purchase a subscription on our membership page.